Winvic Construction - the future of modern contracting
Home arrow Case Studies & Projects arrow Brampton House - Northampton
Brampton House - Northampton Print E-mail
bramptonhouse
  • As part of a 27,000 sq ft office development, Brampton House provides high specification office accommodation.
  • The envelope cleverly combines terracotta rainscreen and flat panel cladding, with Brise Soleil over glazed areas.  An open staircase is housed in a curtain walled entrance.
  • A contemporary, spacious environment has been created and uses of finishes such as oak, walnut, tiled surfaces and stainless steel.
  • Fully fitted, the raised access floor contains Cat 5 data cabling, heating and cooling is provided by a VRV system.  A media wall is installed in the boardroom.
 
< Prev   Next >
© 2009 Winvic Construction - The Future of Modern Contracting
Sublime Media Ltd: Web Design, Maintenance and Hosting URL rewriting by Artio, sponsored by Traveliana.