At 726,000 sq ft this Distribution Centre is vast in every sense.
7,200 pre-cast driven piles at 16m long, through PFA lagoons, support the building.Our engineering and technical solutions, precise planning and delivery were crucial to the success of the project, constructed on the former Fletton brick pits.
16m to haunch
2,400 tonnes of steel
71 loading doors
40,000 ft of modern office plus mezzanine hub offices
Innovative techniques developed by our ProShed team aided
construction, such as prowall dock surrounds, steel ground beams and
pre cast lift shaft.
PHASE 2 - A further 500,000 sq ft was constructed using similar techniques with in excess of 5,000 piles.