Distribution Great Bear

Desborough

View this project's Fit Out case study Client: Hampton Brook
Architect: Tew & Smith
Engineer: BCAL
Programme: 52 weeks.
Airtest Result – 1.82m3/(h.m2)

Operating for Masterfoods, our Great Bear contract was for a fully fitted and operational distribution facility in 52 weeks. The Ground solution included major earthworks cut and fill, with dynamic compaction and stabilisation techniques.

The building makes use of modern construction methods and where possible employs off site component manufacture. VNA and wide aisle racking solutions are housed in ambient and chilled chambers, 75% of the building is temperature controlled. In rack and high level sprinklers are installed to F.M. standards.

As well as conventional docks, the facility also employs a four auto offload docking system. Full security, BMS and data systems were installed.