£4.7m
BREEAM Very Good
955,120 ft2 BREEAM Very Good
£42m900,000 ft2, 25m highBREEAM Excellent
£15m650,000ft2BREEAM Excellent
Operating for Masterfoods, our Great Bear contract was for a fully fitted and operational distribution facility in 52 weeks. The Ground solution included major earthworks cut and fill, with dynamic compaction and stabilisation techniques.
The building makes use of modern construction methods and where possible employs off site component manufacture. VNA and wide aisle racking solutions are housed in ambient and chilled chambers, 75% of the building is temperature controlled. In rack and high level sprinklers are installed to F.M. standards.
As well as conventional docks, the facility also employs a four auto offload docking system. Full security, BMS and data systems were installed.