Distribution Healthrow Cargo Handling Unit

Poyle – Slough

Client: Segro Plc
Architect: Langley Hall Associates
Engineer: Bradbrook Consulting
Programme: Completed

SEGRO awarded Winvic Construction the contract to design, construct and deliver a new 60,000 sq ft facility at their Poyle Business Park, near Heathrow.

The project comprised of the construction of a cargo handling unit, which also incorporated a three storey office building. External areas included service yards, car parking and associated 278 highway works.

Works carried out was as follows:

  • Removal of petroleum hydrocarbons.
  • Gas protection to building footprint.
  • De-watering for drainage an foundations due to high water table.
  • Geo-light attenuationt ank.
  • 2m pre-cast concrete quickwall to warehouse perimeter.
  • Internal pre-cast pits, 2m in depth to accommodate a lateral loading of 33 tonnes.
  • 240mm thick concrete slab to accommodate excessive loadings.
  • Authorisation permits from BAA Heathrow for crane lifts.
  • Surface water discharge consent due to the adjacent river.
  • Acoustic enhancements to office elevation.

 