Fitout Great Bear

Desborough

View this project's Distribution case studyView this project's Temperature controlled case study Client: Great Bear
Programme – 22 wks

This 400,000ft2 facility is used for the storage and distribution of confectionery and as a consequence required a comprehensive fit out. Multi service items where designed, procured and installed by Winvic.

Requirements spanned from temperature controlled chambers to auto offload docking machinery. The occupier was handed a fully operational building on the day of P.C

The comprehensive fit out included:
  • VNA and wide aisle racking
  • High level and in rack sprinkler systems to F.M standard
  • Temperature controlled chambers
  • Maturation areas
  • Vesta fire prevention system
  • Auto offload dock levellers
  • Rack and floor labelling
  • Forklift guidance
  • CCTV and security
  • Full BMS and Data systems
  • Battery charge and maintenance workshops