OUR PROJECTS

 

CO-OP – CASTLEWOOD BUSINESS PARK

Category: Fit Out

PROJECT VALUE:

£13.2m

END-USER:

Co-op

ARCHITECT:

RPS

ENGINEER:

TR Collier

PROGRAMME:

24 weeks

COMPLETED:

January 2013

Following the base build for this project, Winvic carried out the fit-out for a fully operational distribution facility for the Co-op. Works comprised an ambient area, fully-racked with high-level and in-rack sprinkler protection, chilled and freezer areas formed via a fridge-panel wall and roof construction, £1.2m refrigeration package to maintain a chilled temperature of 1°C and a freezer at -22°C, complete installation of offices to the Co-op’s standard specification, including male and female locker rooms, showers, a canteen, a fully-equipped kitchen, 20 meeting rooms and offices and the installation of a required MOT testing apparatus to the VMU.